Whose Rebuild
The money to rebuild north St. Louis exists. The question is whose rebuild this becomes. Who manages the money, who does the work, and who keeps what gets built. Here is the ledger, dated and linked to its source.
More than 5,000 buildings were damaged or destroyed. Settlement money, state money, and federal money are all in motion. The danger is not that nothing exists. The danger is that the dollar gets thinner every time it changes hands before it reaches your roof.
Local contractors hold the licenses and the skill to rebuild these blocks. The structure pays them after the work is done and inspected, which means carrying the labor and the materials up front. If you cannot float it, you are pushed to partner up just to get in the door. That is how the labor stays local and the ownership leaves.
What the wind took, and what came after
The EF3 tornado of May 16, 2025 cut a path roughly 23 miles long through the north side. It killed 5 people and damaged or destroyed more than 5,000 buildings in some of the city's poorest neighborhoods. The city has estimated the full recovery could cost between $1.6 billion and $2 billion.
Watch a recovery dollar travel
Send one public dollar down the chain and see what reaches the block. Step through it.
Who manages the money, and how the deal is built
Price and terms decide who carries the risk. Here is who holds the contract, what their record shows, and where the burden lands. Tap any card.
The case for an outside manager, and what it costs the block
My name is Adam Hopkins. I stood in the room where this model was explained. A fair look means naming what the approach offers before naming what it takes. The management contract can reach 26 million dollars. Here is the trade, plainly.
The mayor said the field of firms that can do this work has narrowed, and that is true. The question a representative has to answer is the simple one. When the field is this thin and the fee comes off the top, what does the state owe the local firms who could carry the work if they had the capital and the bonding. That seat, the one that reads the price, the terms, and the leverage on behalf of the block, is the seat that was missing at the table. Put it there.
The ledger, figure by figure
Each number carries a source link and an information button with the exact sentence behind it. Nothing here is rounded for effect.
Two roads, one already run in Missouri
St. Louis is not the first American city to rebuild from the ground up. Start close to home, then look at the cautionary version. Same disaster, different hands on the wheel.
Joplin
The deadliest single tornado in modern American history leveled a third of the town. It took about 161 lives, injured about 1,000, and damaged more than 7,000 homes. What happened next is the part St. Louis should study. Joplin officials chose to listen first.
A volunteer body of residents, the Citizens Advisory Recovery Team, ran a months long public forum to gather what people wanted the new Joplin to be. Their report became the city's long term recovery plan, presented to the city council and adopted as the path forward.
Roughly two years on, the city reported that about 84 percent of homes and 90 percent of businesses had been rebuilt, repaired, or permitted. Residents held the pen on the plan, and local hands stayed at the center of the work.
Source: KSDK, What St. Louis can learn from JoplinThe Road Home
Louisiana ran the largest housing recovery program in the country's history, about 7.5 billion dollars in federal rebuild money. The state handed the wheel to an out of state firm, ICF International of Virginia, on a contract worth up to 756 million dollars to manage it, roughly a 10 percent cut. The firm had helped design the program before it won the bid.
About 8 months in, the program had taken 101,000 applications and paid out fewer than 300 grants. A state audit later found incorrect grant amounts in 37 percent of the cases it sampled.
The firm's contract ended in 2009. It walked away roughly 900 million dollars richer and was effectively barred from new state work, while families were still waiting on inspections and checks. The manager did fine. The block did not.
Source: NOLA.com, ICF's oversight of Road Home endsBoth faced ruin. One recovery moved with local people holding the pen and local hands at the center. The other moved slowly while a distant firm got rich and the families it was hired to serve waited years. St. Louis is standing at that same fork right now, with an out of state manager already hired and the work already structured. Which story the north side repeats comes down to the terms, and the terms are something a state representative can change. Choose the Joplin road. Then write it into law.
The fix a state representative can carry
The shortfall and the float are not acts of God. They are choices written into law and into contracts. Here is what changes them.
The work is ours. The wealth should be too.
My name is Adam Hopkins. I was in both rooms, the one where the money was decided and the one where the terms were handed down. Stand with a campaign that keeps the rebuild in the hands that build it.
